ACT-153 / ITP / R00
Lift Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release shaft survey | — | — | — | — | — |
| Coordinate authorised installation | — | — | — | — | — |
| Obtain readiness inspection | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: lift rails, car, doors, drive and controller
Inspection sequence
- Release shaft survey
- Coordinate authorised installation
- Obtain readiness inspection
Inspection controls
- Rail plumb, brackets, landing alignment and equipment IDs
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________