Lift Installation — Inspection and Test Plan

Lift InstallationSpecialist Systems

ACT-153 / ITP / R00

Lift Installation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release shaft survey—————
Coordinate authorised installation—————
Obtain readiness inspection—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: lift rails, car, doors, drive and controller

Inspection sequence

  • Release shaft survey
  • Coordinate authorised installation
  • Obtain readiness inspection

Inspection controls

  • Rail plumb, brackets, landing alignment and equipment IDs
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.