ACT-153 / CHK / R00
Lift Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release shaft survey | — | — | — | — | — |
| Coordinate authorised installation | — | — | — | — | — |
| Obtain readiness inspection | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: lift rails, car, doors, drive and controller
Inspection points
- Release shaft survey
- Coordinate authorised installation
- Obtain readiness inspection
Records and release
- Rail plumb, brackets, landing alignment and equipment IDs
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________