ACT-152 / RA / R00
ELV Systems Testing and Commissioning — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Verify subsystems | — | — | — | — | — |
| Witness approved cross-system scenarios | — | — | — | — | — |
| Check restoration | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: ELV scripts, test devices and asset list
Task risk review
- Verify subsystems
- Witness approved cross-system scenarios
- Check restoration
Assessment prompts
- Assess interfaces relevant to this location: Shared service routes, powered equipment and elevated access.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________