ACT-152 / CHK / R00
ELV Systems Testing and Commissioning — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Verify subsystems | — | — | — | — | — |
| Witness approved cross-system scenarios | — | — | — | — | — |
| Check restoration | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: ELV scripts, test devices and asset list
Inspection points
- Verify subsystems
- Witness approved cross-system scenarios
- Check restoration
Records and release
- Timestamps, evidence, defects and retest approval
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________