ELV Systems Testing and Commissioning — Inspection and Test Plan

ELV Systems Testing and CommissioningELV

ACT-152 / ITP / R00

ELV Systems Testing and Commissioning — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Verify subsystems—————
Witness approved cross-system scenarios—————
Check restoration—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: ELV scripts, test devices and asset list

Inspection sequence

  • Verify subsystems
  • Witness approved cross-system scenarios
  • Check restoration

Inspection controls

  • Timestamps, evidence, defects and retest approval
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________