ACT-151 / RA / R00
Building Management System (BMS) — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Coordinate addressing | — | — | — | — | — |
| Witness point-to-point checks | — | — | — | — | — |
| Verify trends, alarms and control modes | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: BMS controllers, sensors, network and points list
Task risk review
- Coordinate addressing
- Witness point-to-point checks
- Verify trends, alarms and control modes
Assessment prompts
- Assess interfaces relevant to this location: Shared service routes, powered equipment and elevated access.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________