ACT-151 / CHK / R00
Building Management System (BMS) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate addressing | — | — | — | — | — |
| Witness point-to-point checks | — | — | — | — | — |
| Verify trends, alarms and control modes | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: BMS controllers, sensors, network and points list
Inspection points
- Coordinate addressing
- Witness point-to-point checks
- Verify trends, alarms and control modes
Records and release
- Tags, calibration, routing and trend evidence
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________