ACT-151 / ITP / R00
Building Management System (BMS) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Coordinate addressing | — | — | — | — | — |
| Witness point-to-point checks | — | — | — | — | — |
| Verify trends, alarms and control modes | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: BMS controllers, sensors, network and points list
Inspection sequence
- Coordinate addressing
- Witness point-to-point checks
- Verify trends, alarms and control modes
Inspection controls
- Tags, calibration, routing and trend evidence
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________