Building Management System (BMS) — Inspection and Test Plan

Building Management System (BMS)ELV

ACT-151 / ITP / R00

Building Management System (BMS) — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Coordinate addressing—————
Witness point-to-point checks—————
Verify trends, alarms and control modes—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: BMS controllers, sensors, network and points list

Inspection sequence

  • Coordinate addressing
  • Witness point-to-point checks
  • Verify trends, alarms and control modes

Inspection controls

  • Tags, calibration, routing and trend evidence
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.