Intercom System — Risk Assessment

Intercom SystemELV

ACT-150 / RA / R00

Intercom System — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Confirm endpoint locations—————
Wire and label—————
Test speech and authorised door release—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: intercom stations, controller and interfaces

Task risk review

  • Confirm endpoint locations
  • Wire and label
  • Test speech and authorised door release

Assessment prompts

  • Assess interfaces relevant to this location: Shared service routes, powered equipment and elevated access.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________