ACT-150 / CHK / R00
Intercom System — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm endpoint locations | — | — | — | — | — |
| Wire and label | — | — | — | — | — |
| Test speech and authorised door release | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: intercom stations, controller and interfaces
Inspection points
- Confirm endpoint locations
- Wire and label
- Test speech and authorised door release
Records and release
- Endpoint pairs, clarity, privacy and failure state
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________