ACT-150 / ITP / R00
Intercom System — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm endpoint locations | — | — | — | — | — |
| Wire and label | — | — | — | — | — |
| Test speech and authorised door release | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: intercom stations, controller and interfaces
Inspection sequence
- Confirm endpoint locations
- Wire and label
- Test speech and authorised door release
Inspection controls
- Endpoint pairs, clarity, privacy and failure state
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________