ACT-137 / RA / R00
UPS and Batteries Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Release ventilation | — | — | — | — | — |
| Set out enclosures | — | — | — | — | — |
| Coordinate supplier bypass and backup checks | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: UPS, racks, batteries and monitoring
Task risk review
- Release ventilation
- Set out enclosures
- Coordinate supplier bypass and backup checks
Assessment prompts
- Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________