ACT-137 / CHK / R00
UPS and Batteries Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release ventilation | — | — | — | — | — |
| Set out enclosures | — | — | — | — | — |
| Coordinate supplier bypass and backup checks | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: UPS, racks, batteries and monitoring
Inspection points
- Release ventilation
- Set out enclosures
- Coordinate supplier bypass and backup checks
Records and release
- Battery lot, polarity verification, autonomy and alerts
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________