ACT-137 / ITP / R00
UPS and Batteries Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release ventilation | — | — | — | — | — |
| Set out enclosures | — | — | — | — | — |
| Coordinate supplier bypass and backup checks | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: UPS, racks, batteries and monitoring
Inspection sequence
- Release ventilation
- Set out enclosures
- Coordinate supplier bypass and backup checks
Inspection controls
- Battery lot, polarity verification, autonomy and alerts
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________