Skip to content

Risk AssessmentACT-135-RAR00Available

Distribution Boards Installation — Risk Assessment

Distribution Boards InstallationElectrical

ACT-135 / RA / R00

Distribution Boards Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Confirm panel schedule and support—————
Terminate with isolation—————
Inspect before service—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: boards, breakers, glands and labels

Task risk review

  • Confirm panel schedule and support
  • Terminate with isolation
  • Inspect before service

Assessment prompts

  • Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________