ACT-135 / RA / R00
Distribution Boards Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Confirm panel schedule and support | — | — | — | — | — |
| Terminate with isolation | — | — | — | — | — |
| Inspect before service | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: boards, breakers, glands and labels
Task risk review
- Confirm panel schedule and support
- Terminate with isolation
- Inspect before service
Assessment prompts
- Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________