ACT-135 / CHK / R00
Distribution Boards Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm panel schedule and support | — | — | — | — | — |
| Terminate with isolation | — | — | — | — | — |
| Inspect before service | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: boards, breakers, glands and labels
Inspection points
- Confirm panel schedule and support
- Terminate with isolation
- Inspect before service
Records and release
- Labels, phase balance, protection and circuit tests
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________