ACT-135 / ITP / R00
Distribution Boards Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm panel schedule and support | — | — | — | — | — |
| Terminate with isolation | — | — | — | — | — |
| Inspect before service | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: boards, breakers, glands and labels
Inspection sequence
- Confirm panel schedule and support
- Terminate with isolation
- Inspect before service
Inspection controls
- Labels, phase balance, protection and circuit tests
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________