Skip to content

Risk AssessmentACT-130-RAR00Available

LV Cable Pulling and Termination — Risk Assessment

LV Cable Pulling and TerminationElectrical

ACT-130 / RA / R00

LV Cable Pulling and Termination — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Release pathways—————
Identify circuits and check pulling controls—————
Terminate and label isolated equipment—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: LV cables, glands, lugs and pulling tools

Task risk review

  • Release pathways
  • Identify circuits and check pulling controls
  • Terminate and label isolated equipment

Assessment prompts

  • Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3