ACT-130 / ITP / R00
LV Cable Pulling and Termination — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release pathways | — | — | — | — | — |
| Identify circuits and check pulling controls | — | — | — | — | — |
| Terminate and label isolated equipment | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: LV cables, glands, lugs and pulling tools
Inspection sequence
- Release pathways
- Identify circuits and check pulling controls
- Terminate and label isolated equipment
Inspection controls
- Cable IDs, torque, insulation test and phase marking
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________