ACT-130 / CHK / R00
LV Cable Pulling and Termination — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release pathways | — | — | — | — | — |
| Identify circuits and check pulling controls | — | — | — | — | — |
| Terminate and label isolated equipment | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: LV cables, glands, lugs and pulling tools
Inspection points
- Release pathways
- Identify circuits and check pulling controls
- Terminate and label isolated equipment
Records and release
- Cable IDs, torque, insulation test and phase marking
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________