ACT-129 / RA / R00
Conduit Installation (Concealed / Exposed) — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Coordinate concealed routes and embeds | — | — | — | — | — |
| Preserve draw access | — | — | — | — | — |
| Inspect bore before cover | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: conduit, boxes, couplers and draw wire
Task risk review
- Coordinate concealed routes and embeds
- Preserve draw access
- Inspect bore before cover
Assessment prompts
- Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________