Conduit Installation (Concealed / Exposed) — Risk Assessment

Conduit Installation (Concealed / Exposed)Electrical

ACT-129 / RA / R00

Conduit Installation (Concealed / Exposed) — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Coordinate concealed routes and embeds—————
Preserve draw access—————
Inspect bore before cover—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: conduit, boxes, couplers and draw wire

Task risk review

  • Coordinate concealed routes and embeds
  • Preserve draw access
  • Inspect bore before cover

Assessment prompts

  • Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.