ACT-129 / ITP / R00
Conduit Installation (Concealed / Exposed) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Coordinate concealed routes and embeds | — | — | — | — | — |
| Preserve draw access | — | — | — | — | — |
| Inspect bore before cover | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: conduit, boxes, couplers and draw wire
Inspection sequence
- Coordinate concealed routes and embeds
- Preserve draw access
- Inspect bore before cover
Inspection controls
- Routes, box levels, bends and conduit fill
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________