ACT-129 / CHK / R00
Conduit Installation (Concealed / Exposed) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate concealed routes and embeds | — | — | — | — | — |
| Preserve draw access | — | — | — | — | — |
| Inspect bore before cover | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: conduit, boxes, couplers and draw wire
Inspection points
- Coordinate concealed routes and embeds
- Preserve draw access
- Inspect bore before cover
Records and release
- Routes, box levels, bends and conduit fill
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________