Cable Trays and Trunking Installation — Risk Assessment

Cable Trays and Trunking InstallationElectrical

ACT-128 / RA / R00

Cable Trays and Trunking Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Coordinate route and segregation—————
Fix and support trays—————
Bond joints before cabling—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: tray, supports, couplers and bonding straps

Task risk review

  • Coordinate route and segregation
  • Fix and support trays
  • Bond joints before cabling

Assessment prompts

  • Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.