Skip to content

Inspection and Test PlanACT-128-ITPR00Available

Cable Trays and Trunking Installation — Inspection and Test Plan

Cable Trays and Trunking InstallationElectrical

ACT-128 / ITP / R00

Cable Trays and Trunking Installation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Coordinate route and segregation—————
Fix and support trays—————
Bond joints before cabling—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: tray, supports, couplers and bonding straps

Inspection sequence

  • Coordinate route and segregation
  • Fix and support trays
  • Bond joints before cabling

Inspection controls

  • Spans, clearances, bond continuity and fire compartments
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3