ACT-128 / CHK / R00
Cable Trays and Trunking Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate route and segregation | — | — | — | — | — |
| Fix and support trays | — | — | — | — | — |
| Bond joints before cabling | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: tray, supports, couplers and bonding straps
Inspection points
- Coordinate route and segregation
- Fix and support trays
- Bond joints before cabling
Records and release
- Spans, clearances, bond continuity and fire compartments
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________