FM200 / Clean Agent System — Risk Assessment

FM200 / Clean Agent SystemFirefighting

ACT-123 / RA / R00

FM200 / Clean Agent System — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Release protected volume—————
Verify nozzle plan and circuits—————
Obtain specialist acceptance—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: listed agent cylinders, nozzles and controls

Task risk review

  • Release protected volume
  • Verify nozzle plan and circuits
  • Obtain specialist acceptance

Assessment prompts

  • Assess interfaces relevant to this location: System impairment, stored energy and occupied-area interfaces.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.