Skip to content

ChecklistACT-123-CHKR00Available

FM200 / Clean Agent System — Inspection Checklist

FM200 / Clean Agent SystemFirefighting

ACT-123 / CHK / R00

FM200 / Clean Agent System — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Release protected volume—————
Verify nozzle plan and circuits—————
Obtain specialist acceptance—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: listed agent cylinders, nozzles and controls

Inspection points

  • Release protected volume
  • Verify nozzle plan and circuits
  • Obtain specialist acceptance

Records and release

  • Cylinder IDs, enclosure integrity, abort and alarms; no unauthorised discharge
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3