ACT-121 / RA / R00
Fire Hydrant and Hose Reel System — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Confirm reach and access | — | — | — | — | — |
| Install to approved zones | — | — | — | — | — |
| Witness operation | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: hydrants, reels, cabinet and valves
Task risk review
- Confirm reach and access
- Install to approved zones
- Witness operation
Assessment prompts
- Assess interfaces relevant to this location: System impairment, stored energy and occupied-area interfaces.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________