| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm reach and access | — | — | — | — | — |
| Install to approved zones | — | — | — | — | — |
| Witness operation | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: hydrants, reels, cabinet and valves
Inspection sequence
- Confirm reach and access
- Install to approved zones
- Witness operation
Inspection controls
- Signage, pressure and discharge readings, tag and accessories
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.