Skip to content

ChecklistACT-121-CHKR00Available

Fire Hydrant and Hose Reel System — Inspection Checklist

Fire Hydrant and Hose Reel SystemFirefighting

ACT-121 / CHK / R00

Fire Hydrant and Hose Reel System — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Confirm reach and access—————
Install to approved zones—————
Witness operation—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: hydrants, reels, cabinet and valves

Inspection points

  • Confirm reach and access
  • Install to approved zones
  • Witness operation

Records and release

  • Signage, pressure and discharge readings, tag and accessories
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3