Skip to content

Risk AssessmentACT-116-RAR00Available

Pressure Testing of Water Piping — Risk Assessment

Pressure Testing of Water PipingPlumbing

ACT-116 / RA / R00

Pressure Testing of Water Piping — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Identify potable section—————
Verify cleanliness and boundary—————
Witness test before disinfection—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: water-test pump, gauges and approved isolation

Task risk review

  • Identify potable section
  • Verify cleanliness and boundary
  • Witness test before disinfection

Assessment prompts

  • Assess interfaces relevant to this location: Stored pressure, contamination and access to pipework.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3