ACT-116 / CHK / R00
Pressure Testing of Water Piping — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Identify potable section | — | — | — | — | — |
| Verify cleanliness and boundary | — | — | — | — | — |
| Witness test before disinfection | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: water-test pump, gauges and approved isolation
Inspection points
- Identify potable section
- Verify cleanliness and boundary
- Witness test before disinfection
Records and release
- Medium, approved pressure and duration, readings and retest
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________