ACT-116 / ITP / R00
Pressure Testing of Water Piping — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Identify potable section | — | — | — | — | — |
| Verify cleanliness and boundary | — | — | — | — | — |
| Witness test before disinfection | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: water-test pump, gauges and approved isolation
Inspection sequence
- Identify potable section
- Verify cleanliness and boundary
- Witness test before disinfection
Inspection controls
- Medium, approved pressure and duration, readings and retest
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________