ACT-115 / RA / R00
Grease Traps and Interceptors — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Verify maintenance access and inverts | — | — | — | — | — |
| Install and connect | — | — | — | — | — |
| Inspect serviceability | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: interceptor, covers, seals and vents
Task risk review
- Verify maintenance access and inverts
- Install and connect
- Inspect serviceability
Assessment prompts
- Assess interfaces relevant to this location: Stored pressure, contamination and access to pipework.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________