ACT-115 / ITP / R00
Grease Traps and Interceptors — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Verify maintenance access and inverts | — | — | — | — | — |
| Install and connect | — | — | — | — | — |
| Inspect serviceability | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: interceptor, covers, seals and vents
Inspection sequence
- Verify maintenance access and inverts
- Install and connect
- Inspect serviceability
Inspection controls
- Flow direction, cover rating, vents and leakage
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________