Inspection and Test PlanACT-109-ITPR00Available

Drainage and Soil Piping (uPVC / HDPE / Cast Iron) — Inspection and Test Plan

Drainage and Soil Piping (uPVC / HDPE / Cast Iron)Plumbing

ACT-109 / ITP / R00

Drainage and Soil Piping (uPVC / HDPE / Cast Iron) — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Coordinate falls and cleanouts—————
Join and support—————
Seal penetrations before enclosure—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: drainage pipe, fittings and acoustic supports

Inspection sequence

  • Coordinate falls and cleanouts
  • Join and support
  • Seal penetrations before enclosure

Inspection controls

  • Invert levels, access and flow or water test
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.