ACT-109 / ITP / R00
Drainage and Soil Piping (uPVC / HDPE / Cast Iron) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Coordinate falls and cleanouts | — | — | — | — | — |
| Join and support | — | — | — | — | — |
| Seal penetrations before enclosure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: drainage pipe, fittings and acoustic supports
Inspection sequence
- Coordinate falls and cleanouts
- Join and support
- Seal penetrations before enclosure
Inspection controls
- Invert levels, access and flow or water test
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________