ACT-109 / CHK / R00
Drainage and Soil Piping (uPVC / HDPE / Cast Iron) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate falls and cleanouts | — | — | — | — | — |
| Join and support | — | — | — | — | — |
| Seal penetrations before enclosure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: drainage pipe, fittings and acoustic supports
Inspection points
- Coordinate falls and cleanouts
- Join and support
- Seal penetrations before enclosure
Records and release
- Invert levels, access and flow or water test
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________