Skip to content

Risk AssessmentACT-105-RAR00Available

Kitchen Exhaust System — Risk Assessment

Kitchen Exhaust SystemHVAC

ACT-105 / RA / R00

Kitchen Exhaust System — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Coordinate hood and discharge—————
Preserve cleanable route—————
Release before enclosure—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: grease duct, access doors, fan and fire enclosure

Task risk review

  • Coordinate hood and discharge
  • Preserve cleanable route
  • Release before enclosure

Assessment prompts

  • Assess interfaces relevant to this location: Stored energy, access and equipment handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3