ACT-105 / CHK / R00
Kitchen Exhaust System — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate hood and discharge | — | — | — | — | — |
| Preserve cleanable route | — | — | — | — | — |
| Release before enclosure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: grease duct, access doors, fan and fire enclosure
Inspection points
- Coordinate hood and discharge
- Preserve cleanable route
- Release before enclosure
Records and release
- Grease-tight joints, cleanout access, fire protection and fan duty
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________