Kitchen Exhaust System — Inspection and Test Plan

Kitchen Exhaust SystemHVAC

ACT-105 / ITP / R00

Kitchen Exhaust System — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Coordinate hood and discharge—————
Preserve cleanable route—————
Release before enclosure—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: grease duct, access doors, fan and fire enclosure

Inspection sequence

  • Coordinate hood and discharge
  • Preserve cleanable route
  • Release before enclosure

Inspection controls

  • Grease-tight joints, cleanout access, fire protection and fan duty
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.