ACT-104 / ITP / R00
Grilles, Diffusers and Dampers — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Coordinate module and access | — | — | — | — | — |
| Install to correct orientation | — | — | — | — | — |
| Verify movement before balancing | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: terminals, dampers, fixings and access hatches
Inspection sequence
- Coordinate module and access
- Install to correct orientation
- Verify movement before balancing
Inspection controls
- Tags, actuator operation, airflow settings and access
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________