ACT-102 / RA / R00
Pumps Installation (HVAC) — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Release base | — | — | — | — | — |
| Align pump and driver | — | — | — | — | — |
| Verify independent piping support and commission | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: pumps, bases, couplings and valves
Task risk review
- Release base
- Align pump and driver
- Verify independent piping support and commission
Assessment prompts
- Assess interfaces relevant to this location: Stored energy, access and equipment handling.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________