Pumps Installation (HVAC) — Inspection and Test Plan

Pumps Installation (HVAC)HVAC

ACT-102 / ITP / R00

Pumps Installation (HVAC) — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release base—————
Align pump and driver—————
Verify independent piping support and commission—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: pumps, bases, couplings and valves

Inspection sequence

  • Release base
  • Align pump and driver
  • Verify independent piping support and commission

Inspection controls

  • Alignment, vibration, rotation and duty readings
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.