Pumps Installation (HVAC) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release base | — | — | — | — | — |
| Align pump and driver | — | — | — | — | — |
| Verify independent piping support and commission | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: pumps, bases, couplings and valves
Inspection points
- Release base
- Align pump and driver
- Verify independent piping support and commission
Records and release
- Alignment, vibration, rotation and duty readings
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________