ACT-101 / RA / R00
FCU Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Confirm access | — | — | — | — | — |
| Support unit independently | — | — | — | — | — |
| Connect and test drain and water services | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: fan coils, hangers, valves and drain fittings
Task risk review
- Confirm access
- Support unit independently
- Connect and test drain and water services
Assessment prompts
- Assess interfaces relevant to this location: Stored energy, access and equipment handling.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________