Risk AssessmentACT-101-RAR00Available

FCU Installation — Risk Assessment

FCU InstallationHVAC

ACT-101 / RA / R00

FCU Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Confirm access—————
Support unit independently—————
Connect and test drain and water services—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: fan coils, hangers, valves and drain fittings

Task risk review

  • Confirm access
  • Support unit independently
  • Connect and test drain and water services

Assessment prompts

  • Assess interfaces relevant to this location: Stored energy, access and equipment handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________