ACT-101 / ITP / R00
FCU Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm access | — | — | — | — | — |
| Support unit independently | — | — | — | — | — |
| Connect and test drain and water services | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: fan coils, hangers, valves and drain fittings
Inspection sequence
- Confirm access
- Support unit independently
- Connect and test drain and water services
Inspection controls
- Unit tag, filter access, drain flow and controls
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________