ACT-101 / CHK / R00
FCU Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm access | — | — | — | — | — |
| Support unit independently | — | — | — | — | — |
| Connect and test drain and water services | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: fan coils, hangers, valves and drain fittings
Inspection points
- Confirm access
- Support unit independently
- Connect and test drain and water services
Records and release
- Unit tag, filter access, drain flow and controls
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________