ACT-100 / RA / R00
AHU / FAHU Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Confirm plinth and lifting access | — | — | — | — | — |
| Align section order | — | — | — | — | — |
| Connect duct, piping and condensate | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: AHU sections, mounts, filters and flexible connectors
Task risk review
- Confirm plinth and lifting access
- Align section order
- Connect duct, piping and condensate
Assessment prompts
- Assess interfaces relevant to this location: Stored energy, access and equipment handling.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________