AHU / FAHU Installation — Inspection and Test Plan

AHU / FAHU InstallationHVAC

ACT-100 / ITP / R00

AHU / FAHU Installation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Confirm plinth and lifting access—————
Align section order—————
Connect duct, piping and condensate—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: AHU sections, mounts, filters and flexible connectors

Inspection sequence

  • Confirm plinth and lifting access
  • Align section order
  • Connect duct, piping and condensate

Inspection controls

  • Nameplate, alignment, filters, drain fall and start-up evidence
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.